{"id":1303,"date":"2025-12-30T12:23:21","date_gmt":"2025-12-30T12:23:21","guid":{"rendered":"https:\/\/jpdlfh.com\/?p=1303"},"modified":"2025-12-30T12:23:21","modified_gmt":"2025-12-30T12:23:21","slug":"%e3%82%a4%e3%83%b3%e3%83%80%e3%82%b9%e3%83%88%e3%83%aa%e3%83%bc4-0%e3%81%b8%e3%81%ae%e6%ad%a9%e3%81%bf-%e6%a9%9f%e6%a2%b0%e5%8a%a0%e5%b7%a5%e7%8f%be%e5%a0%b4%e3%81%ab%e3%81%8a%e3%81%91","status":"publish","type":"post","link":"https:\/\/jpdlfh.com\/en\/1303\/","title":{"rendered":"Progress Towards Industry 4.0 \u2013 The Current State of Intelligence and Automation in Machining Operations"},"content":{"rendered":"<p>On-site Implementation of the Fourth Industrial Revolution<br \/>\nAs Industry 4.0 transitions from concept to practice,<a href=\"https:\/\/jpdlfh.com\/en\/?p=1303&amp;preview=true\">Machining<\/a>The manufacturing sector is undergoing its most profound transformation since the advent of NC technology. This transformation extends beyond mere technological upgrades, encompassing the reconstruction of production philosophies, organisational structures, and the very foundations of value creation models. According to McKinsey's latest research, world-leading manufacturers implementing Industry 4.0 technologies achieve average productivity gains of 20\u201330%, quality improvements of 15\u201320%, and equipment utilisation rate increases of 30\u201350%. This paper comprehensively presents the current application status of intelligent and automated technologies in machining workshops through field research, case analysis, and data comparison, providing a roadmap for enterprises' digital transformation.<\/p>\n<p>Part One: Core Technology Stack of Industry 4.0 \u2013 Implementation in Machining Workshops<br \/>\n1.1 Data Perception Layer: From 'dummy devices' to smart terminals<br \/>\nNetwork connectivity and data collection for equipment<\/p>\n<p>Current situation: While leading enterprises achieve equipment network connectivity rates exceeding 85% to 100%, the industry average stands at a mere 35% to 50%.<\/p>\n<p>Key Technology:<\/p>\n<p>OPC UA Unified Architecture: Enabling Interconnection of Multi-Brand Devices<\/p>\n<p>MTConnect Protocol: Data Specification for Machine Tools<\/p>\n<p>Edge Gateway: Solving the digitalisation challenges of legacy equipment (e.g., Siemens MindConnect Nano)<\/p>\n<p>Sensor<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1304\" src=\"https:\/\/jpdlfh.com\/wp-content\/uploads\/2025\/12\/QQ20251102-193538-1.png\" alt=\"\" width=\"569\" height=\"552\" srcset=\"https:\/\/jpdlfh.com\/wp-content\/uploads\/2025\/12\/QQ20251102-193538-1.png 569w, https:\/\/jpdlfh.com\/wp-content\/uploads\/2025\/12\/QQ20251102-193538-1-12x12.png 12w\" sizes=\"auto, (max-width: 569px) 100vw, 569px\" \/><\/p>\n<p>Force sensor: Real-time monitoring of spindle load, tool wear detection accuracy 95%<\/p>\n<p>Vibration sensor: Predictive maintenance, warning of bearing failure 2\u20133 weeks in advance<\/p>\n<p>Acoustic Emission Sensor: Monitors micro-machining processes and detects blade edge chipping as small as 0.1mm.<\/p>\n<p>Temperature Sensor Network: Comprehensive temperature field monitoring, enhancing thermal compensation accuracy to \u00b13\u03bcm<\/p>\n<p>Case Study: Digitalisation of Equipment at a Precision Components Manufacturer<\/p>\n<p>Before modification: Of the 32 CNC machines, only 8 were equipped with basic status display functionality.<\/p>\n<p>Retrofitting plan: Installation of low-cost IoT modules (unit cost under $800)<\/p>\n<p>Results: Within six months, equipment utilisation increased from 581 TP3T to 721 TP3T, whilst unplanned downtime decreased by 651 TP3T.<\/p>\n<p>1.2 Digital Twin: The Deep Integration of Virtual and Physical Realms<br \/>\nDigital Twin of Machine Tools<\/p>\n<p>Geometric Accuracy Twin: Development of a Full-Stroke Accuracy Model via Error Mapping Based on Laser Interferometry<\/p>\n<p>Thermal Characteristics Twin: Development of a Three-Dimensional Thermal Deformation Prediction Model Using Multiple Temperature Sensor Data<\/p>\n<p>Dynamics Twin: Simulates vibration characteristics under varying cutting parameters to optimise machining parameters.<\/p>\n<p>Digital Twin of the Manufacturing Process<\/p>\n<p>Cutting process simulation: Prediction of cutting forces, temperatures, and tool life using software such as AdvantEdge and ThirdWave.<\/p>\n<p>Deformation prediction: The machining deformation prediction accuracy for thin-walled components can achieve 85% or higher.<\/p>\n<p>Virtual debugging: Reduces new programme verification time from hours to minutes, lowering collision risk by 99.11%<\/p>\n<p>Case Study: Application of Digital Twins in the Machining of Aeronautical Structural Components<\/p>\n<p>Project: Defect Rate of 30% Due to Machining Deformation in Large Aluminium Alloy Frames<\/p>\n<p>Solution: Building a Digital Twin Integrating Materials, Processes and Fixtures<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1213\" src=\"https:\/\/jpdlfh.com\/wp-content\/uploads\/2025\/12\/QQ20251102-193711.png\" alt=\"\" width=\"752\" height=\"578\" srcset=\"https:\/\/jpdlfh.com\/wp-content\/uploads\/2025\/12\/QQ20251102-193711.png 752w, https:\/\/jpdlfh.com\/wp-content\/uploads\/2025\/12\/QQ20251102-193711-16x12.png 16w\" sizes=\"auto, (max-width: 752px) 100vw, 752px\" \/><\/p>\n<p>Effect: Pre-compensation reduces deformation by 80% and improves first-pass yield to 95%.<\/p>\n<p>Part Two: Practical Applications of Artificial Intelligence in Machining<br \/>\n2.1 Intelligent Process Optimisation<br \/>\nAdaptation System<\/p>\n<p>Force-controlled adaptation: Real-time adjustment of feed rate based on cutting force (e.g., HEIDENHAIN TNC7 system)<\/p>\n<p>Vibration Suppression Adaptation: Identifies flutter frequency and automatically adjusts spindle speed<\/p>\n<p>Example: In the machining of titanium alloy blades, adaptive control extended tool life by 401 hours and reduced machining time by 251 hours.<\/p>\n<p>AI-driven process parameter optimisation<\/p>\n<p>Deep learning model: Learning optimal parameter combinations based on historical data<\/p>\n<p>Applications of Reinforcement Learning: Systems autonomously explore parameter spaces to find optimal solutions.<\/p>\n<p>Actual results: At a mould manufacturing enterprise, AI-driven optimisation increased rough machining efficiency by 351% and improved the surface quality of finish machining by 201%.<\/p>\n<p>2.2 Intelligent Quality Management<br \/>\nMachine Vision Quality Inspection System<\/p>\n<p>2D Vision: Dimensional measurement accuracy \u00b10.01mm, speed 0.5 seconds per piece<\/p>\n<p>3D Vision: Shape Detection, Point Cloud Density Supported Down to 0.01mm<\/p>\n<p>Deep learning-based defect detection: Surface defect detection accuracy reached 98.511% (TP3T), significantly surpassing the human eye's 85.11% (TP3T).<\/p>\n<p>Audio Quality Monitoring<\/p>\n<p>Tool Breakage Detection: Breakage Identification Accuracy of 99.11% via Cutting Sound Spectrum Analysis TP3T<\/p>\n<p>Assembly Quality Inspection: Bolt Tightening Sound Analysis, Torque Control Accuracy \u00b131 N\u00b7m<\/p>\n<p>Case Study: Intelligent Quality Inspection on an Automobile Engine Production Line<\/p>\n<p>System configuration: 12 industrial cameras + 3 3D scanners + AI processing unit<\/p>\n<p>Inspection capability: Simultaneous detection of 50 critical dimensions and 15 types of surface defects<\/p>\n<p>Economic impact: Reduction of eight quality inspectors, saving \u00a5800,000 in annual labour costs, with early defect detection rate increasing fivefold.<\/p>\n<p>2.3 Predictive Maintenance and Integrity Management<br \/>\nMulti-source Data Fusion Forecasting<\/p>\n<p>Multidimensional analysis of vibration, temperature and current<\/p>\n<p>Remaining service life prediction accuracy: Rolling bearings 85%, spindle 75%, guide rails 90%<\/p>\n<p>Proposal for Optimal Maintenance Timing: Based on a Cost Optimisation Model<\/p>\n<p>Case Study: Predictive Maintenance System for Large-Scale Moulding Workshops<\/p>\n<p>Monitoring scope: 18 large machining centres<\/p>\n<p>Prediction accuracy: Predicts spindle failures 2 to 4 weeks in advance, with an accuracy of 88.11% TP3T<\/p>\n<p>Economic impact: Unplanned stoppages reduced by 70%, repair costs cut by 40%, spare parts inventory decreased by 35%.<\/p>\n<p>Part Three: The Evolution and Integration of Automation Systems<br \/>\n3.1 Flexible Automation Solutions<br \/>\nThe Evolution of Robot Integration Models<\/p>\n<p>First generation: Fence-based isolation, simple material transfer<\/p>\n<p>Second Generation: Human-Machine Collaboration, Safe Coexistence<\/p>\n<p>Third Generation: Mobile Robots + Stationary Robots in Coordination<\/p>\n<p>Fourth Generation: Autonomous robots equipped with basic decision-making capabilities<\/p>\n<p>Mainstream Constitution<\/p>\n<p>Small-batch, high-variety production: Automated Guided Vehicles (AGVs) + Collaborative Robots + Quick-Change Fixtures<\/p>\n<p>Medium-volume production: Articulated robot + dual pallet system<\/p>\n<p>Mass production: dedicated machinery + conveyor belts + robotic systems<\/p>\n<p>Investment Return on Equity Analysed<\/p>\n<p>Basic automation systems: Investment amount 500,000\u20131,500,000 yuan, payback period 1.5\u20132.5 years<\/p>\n<p>High-end flexible system: Investment amount 2\u20135 million yuan, payback period 2\u20133 years<\/p>\n<p>Influencing factors: Lot size, product complexity, labour costs<\/p>\n<p>3.2 Automated Logistics Systems<br \/>\nTool Automation Logistics<\/p>\n<p>Central Tool Magazine: Capacity 200\u2013800 tools, response time &lt;90 seconds<\/p>\n<p>AGV Tool Transfer System: Shared Tooling Resources Across Multiple Machine Tools<\/p>\n<p>Integration of tool preset devices: Automatic transfer of tool length\/radius data<\/p>\n<p>Workpiece Logistics Automation<\/p>\n<p>Automated pallet warehouse: Stores 20 to 200 pallets<\/p>\n<p>Workpiece Identification System: Dual Verification via RFID and Vision Technology<\/p>\n<p>Integrated flow of cleaning, measurement and processing: reduction of points requiring human intervention<\/p>\n<p>Example: Intelligent Tool Management System<\/p>\n<p>System Configuration: Central Tool Magazine + Automated Guided Vehicle (AGV) + Tool Measurement Station + Management Software<\/p>\n<p>Management scale: Accommodates 1,200 tools and 28 machining centres<\/p>\n<p>Effect: Tool preparation time reduced by 75%, tool turnover rate increased threefold, tool inventory decreased by 25%.<\/p>\n<p>Part Four: Data Flow and Information Integration<br \/>\n4.1 Architecture of the Factory Data Platform<br \/>\nTypical architectural configuration<\/p>\n<p>Edge layer: Device data collection and pre-processing<\/p>\n<p>Platform layer: Data storage, analytics and model training<\/p>\n<p>Application layer: MES\/ERP integration, visualisation, mobile applications<\/p>\n<p>Challenges and Countermeasures in Data Standardisation<\/p>\n<p>Subject: Multi-brand, Multi-protocol, Multi-data format<\/p>\n<p>policy of resolving<\/p>\n<p>Real-time Data Integration Achieved Using OPC UA over TSN<\/p>\n<p>Enterprise Data Dictionary Construction (Semantic Standardisation)<\/p>\n<p>Implement a data quality management system<\/p>\n<p>Case Study: Building a Data Platform for an Automotive Parts Company<\/p>\n<p>Data volume: Daily collected data volume 2.3 terabytes<\/p>\n<p>Processing capacity: 5,000 data points per second in real time<\/p>\n<p>Application Effect: Production transparency improved from 451 TP3T to 921 TP3T, with decision-making response time reduced by 701 TP3T.<\/p>\n<p>4.2 Intelligent Upgrades for Manufacturing Execution Systems (MES)<br \/>\nLimitations of Conventional MES<\/p>\n<p>Primarily focused on documentation and reporting<\/p>\n<p>Lacking in predictive and optimisation capabilities<\/p>\n<p>Response time is slow<\/p>\n<p>New Features of Intelligent MES<\/p>\n<p>Real-time scheduling optimisation: dynamic production planning based on current status<\/p>\n<p>Quality Prediction: Advance warning of potential quality issues<\/p>\n<p>Resource Optimisation: Comprehensive optimisation of equipment, tools and personnel<\/p>\n<p>Investment and Return<\/p>\n<p>Intelligent MES System Investment: \u00a51 million to \u00a55 million<\/p>\n<p>Typical effects: Work in progress reduced by 25\u201335%, on-time delivery rate improved by 15\u201325%, quality costs reduced by 20\u201330%.<\/p>\n<p>Part Five: Actual Application Scenarios and Industry Variations<br \/>\n5.1 The Current State of Applications in Enterprises of Different Sizes<br \/>\nLarge enterprises (annual output value &gt; RMB 1 billion)<\/p>\n<p>Application Features: Systematic implementation, covering the entire process<\/p>\n<p>Typical configuration: Digital twin + AI quality inspection + predictive maintenance + automated logistics<\/p>\n<p>Investment intensity: Allocating 3 to 51 per cent of annual sales revenue to digitalisation<\/p>\n<p>Maturity assessment: On average, Industry 4.0 maturity level 3.5 (out of 5) has been achieved.<\/p>\n<p>Medium-sized enterprises (annual output value of 100 million to 1 billion yuan)<\/p>\n<p>Application Features: Focused breakthroughs, phased implementation<\/p>\n<p>Priority Areas: Equipment network connectivity, data visualisation, and automation of critical processes<\/p>\n<p>Investment intensity: 1.5\u201331 per cent of annual sales revenue<\/p>\n<p>Maturity assessment: Average level 2.2<\/p>\n<p>Small-scale enterprises (annual production value &lt; \u00a5100 million)<\/p>\n<p>Application characteristics: Single-function applications, prioritising practicality<\/p>\n<p>Primary applications: Equipment condition monitoring, fundamental data collection<\/p>\n<p>Investment intensity: 0.5\u20131.51 per cent of annual sales revenue<\/p>\n<p>Principal obstacles: insufficient funding, shortage of personnel, concerns regarding investment returns<\/p>\n<p>5.2 Differences in Industry Applications<br \/>\naerospace<\/p>\n<p>Pioneering Frontiers: Digital Twins, Adaptive Machining, and Intelligent Composite Material Processing<\/p>\n<p>Data requirements: Full lifecycle traceability, data retention period exceeding 30 years<\/p>\n<p>Investment Focus: Quality Assurance and Process Management<\/p>\n<p>Automobile Manufacturing<\/p>\n<p>Advanced Fields: Large-scale automation, predictive maintenance, online inspection<\/p>\n<p>Features: Deep integration with automotive manufacturers' systems<\/p>\n<p>Project: Adapting to Electrification and Flexible Production Line Modifications<\/p>\n<p>medical equipment<\/p>\n<p>Special requirements: Strict traceability, clean environment, micro-component machining<\/p>\n<p>Key Focus Areas for Smart Manufacturing: Process Monitoring and Automated Sterile Packaging<\/p>\n<p>Regulatory implications: Compliance with regulatory requirements such as FDA 21 CFR Part 11 is necessary.<\/p>\n<p>Gold Manufacturing<\/p>\n<p>Characteristics: Small-batch production of individual items, reliant on advanced technical expertise<\/p>\n<p>The Path to Intelligence: Digitalisation of Process Knowledge, Intelligent Programming, and Optimisation of Machining Processes<\/p>\n<p>Achievements: A mould manufacturer achieved a 40% reduction in delivery times and a 25% reduction in costs through smart manufacturing upgrades.<\/p>\n<p>Part VI: Implementation Challenges and Response Strategies<br \/>\n6.1 Technical Challenges<br \/>\nChallenges in Data Integration<\/p>\n<p>Current situation: Enterprises utilise an average of 8.4 different software systems.<\/p>\n<p>policy of resolving<\/p>\n<p>Adopt a middleware platform<\/p>\n<p>Establishment of Enterprise Integration Architecture Standards<\/p>\n<p>Implement in stages, beginning with the realisation of critical data flows.<\/p>\n<p>Refurbishment of obsolete equipment<\/p>\n<p>Renewal rate: The average service life of manufacturing equipment in China is 8.2 years, while 30% equipment exceeds 10 years.<\/p>\n<p>Economic solution: low-cost IoT sensors + edge computing<\/p>\n<p>Return on Investment: Single-unit equipment retrofitting costs range from \u00a55,000 to \u00a520,000, with efficiency improvements of 15% to 25%.<\/p>\n<p>6.2 Organisational and Human Resource Challenges<br \/>\nSkills Gap Analysis<\/p>\n<p>Most lacking skills: Data analysis (681 TP3T), automated system maintenance (551 TP3T), industrial software application (521 TP3T)<\/p>\n<p>Changes in workforce composition: The proportion of digital-related occupations has risen from 51% to 15-20%.<\/p>\n<p>Organisational Change<\/p>\n<p>New positions: Data Engineer, Automation Engineer, Digital Project Manager<\/p>\n<p>Training System: Establish an internal certification system and collaborate with vocational schools.<\/p>\n<p>Cultural Transformation: From Experience-Driven to Data-Driven Decision-Making<\/p>\n<p>6.3 Uncertainty of Investment Returns<br \/>\nRisk Management Strategy<\/p>\n<p>Pilot first: Select one or two scenarios that are high-value and deliver rapid results.<\/p>\n<p>Phased investment: Each phase's investment shall be kept within acceptable limits.<\/p>\n<p>Define KPIs: Establish quantifiable success criteria<\/p>\n<p>ROI Calculation Framework<\/p>\n<p>Direct benefits: improved efficiency, enhanced quality, reduced labour costs<\/p>\n<p>Indirect benefits: enhanced flexibility, accelerated market responsiveness, and improved customer satisfaction.<\/p>\n<p>Intangible assets: accumulation of knowledge, brand value, enhancement of employee skills<\/p>\n<p>Part Seven: Trend Forecasts for the Next Three Years<br \/>\n7.1 Technological Development Trends<br \/>\nThe proliferation of edge intelligence<\/p>\n<p>Projection: By 2025, an additional 751 teraparts per terabyte of industrial AI will be deployed at the edge.<\/p>\n<p>Driving factors: real-time requirements, data security, bandwidth constraints<\/p>\n<p>Application scenarios: real-time quality management, adaptive control, predictive maintenance<\/p>\n<p>5G Dedicated Network Applications<\/p>\n<p>Current progress: Over 5,000 industrial 5G private networks have been established.<\/p>\n<p>Strengths: Low latency (&lt;10ms), high reliability (99.9991% uptime), large-scale connectivity<\/p>\n<p>Typical applications: AGV coordination, AR remote maintenance, wireless sensor networks<\/p>\n<p>AI Engineering<\/p>\n<p>Trend: From Custom Development to Platformisation and Modularisation<\/p>\n<p>Low-code AI platform: Enabling process engineers to develop AI applications<\/p>\n<p>Prediction: AI application development costs will be reduced by 60 to 80 per cent.<\/p>\n<p>7.2 Business Model Innovation<br \/>\nMachine as a Service (MaaS)<\/p>\n<p>Model: Billing based on machining time or number of parts<\/p>\n<p>Advantages: Reduced initial investment, with the supplier assuming responsibility for maintenance.<\/p>\n<p>Applicable scenarios: Specialised process equipment, enterprises with significant fluctuations in production capacity<\/p>\n<p>Collaborative Manufacturing Platform<\/p>\n<p>Platform Functions: Production Capacity Matching, Process Integration, Quality Data Sharing<\/p>\n<p>Value: Enhanced equipment utilisation rates, promotion of industrial chain collaboration<\/p>\n<p>Case Study: A platform connected with over 300 enterprises, achieving an average equipment utilisation rate improvement of 181%.<\/p>\n<p>7.3 Progress in Standardisation<br \/>\ninternational standard<\/p>\n<p>RAMI 4.0 (Germany): Reference Architecture Model<\/p>\n<p>IIRA (United States): Industrial Internet Reference Architecture<\/p>\n<p>Chinese Standard: Smart Manufacturing System Architecture<\/p>\n<p>Interconnection Standard<\/p>\n<p>OPC UA has become the de facto standard<\/p>\n<p>The integration of 5G and TSN is driving the standardisation of real-time communications<\/p>\n<p>Accelerating the development of semantic interoperability standards<\/p>\n<p>Conclusion: The Path from Automated Factories to Cognitive Factories<br \/>\nThe application of Industry 4.0 to machining operations has moved beyond the proof-of-concept phase and entered a period of large-scale deployment. However, we must clearly recognise that this represents not merely a technological revolution, but a gradual evolutionary process. Successful transformation requires enterprises to maintain an appropriate balance across the following three dimensions:<\/p>\n<p>Balancing technological sophistication and practicality: There is no need to pursue cutting-edge technologies; instead, one should select the most suitable combination of technologies for their specific requirements. It is often the seemingly 'ordinary' digital enhancements\u2014such as equipment networking and data visualisation\u2014that yield the most direct benefits.<\/p>\n<p>Balancing short-term returns with long-term investment: Build trust through pilot projects delivering rapid, visible results while establishing a long-term technology roadmap. Achieving full Industry 4.0 implementation may require sustained investment spanning five to ten years.<\/p>\n<p>The balance between technological innovation and organisational adaptation: While technology is readily accessible, organisational transformation proves challenging. Building learning organisations, cultivating digital talent, and reforming management processes often present far greater challenges than the introduction of technology itself.<\/p>\n<p>For most machining enterprises, the recommended implementation path is as follows:<\/p>\n<p>Diagnostic assessment (1\u20132 months): Clarifying the current situation, challenges, and potential capabilities<\/p>\n<p>Scenario Selection (1 month): Select 2\u20133 high-value application scenarios<\/p>\n<p>Pilot implementation (3\u20136 months): Conduct small-scale verification and accumulate experience.<\/p>\n<p>Large-scale rollout (1\u20132 years): Gradually expand the scope of application<\/p>\n<p>Continuous Improvement (Continuous): Establishing a Continuous Improvement Mechanism<\/p>\n<p>Looking ahead, machining workshops will transition from 'automation' to 'autonomy'. Future cognitive factories will not merely execute tasks automatically, but autonomously perceive their environment, optimise processes independently, and make self-directed judgements and adjustments. Yet however technology evolves, the essence of manufacturing remains unchanged\u2014producing compliant products at reasonable cost and at the appropriate time. All Industry 4.0 technologies must ultimately serve this fundamental objective.<\/p>\n<p>For enterprises considering or already embarking upon digital transformation, the best advice is as follows: commence today, but begin with modest steps; exercise patience, for this is not a sprint but a marathon-like long-term endeavour; and most crucially, always maintain the creation of customer value as the ultimate objective. Guided by such principles, Industry 4.0 will become not merely a technological upgrade, but a fundamental restructuring of a company's competitive edge.<\/p>","protected":false},"excerpt":{"rendered":"<p>\u7b2c\u56db\u6b21\u7523\u696d\u9769\u547d\u306e\u73fe\u5834\u5b9f\u8df5 \u300c\u30a4\u30f3\u30c0\u30b9\u30c8\u30ea\u30fc4.0\u300d\u304c\u6982\u5ff5\u304b\u3089\u5b9f\u8df5\u3078\u3068\u79fb\u884c\u3059\u308b\u4e2d\u3001\u6a5f\u68b0\u52a0\u5de5\u73fe\u5834\u306fNC\u6280\u8853\u8a95\u751f\u4ee5\u6765 [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[28],"tags":[],"class_list":["post-1303","post","type-post","status-publish","format-standard","hentry","category-28"],"_links":{"self":[{"href":"https:\/\/jpdlfh.com\/en\/wp-json\/wp\/v2\/posts\/1303","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jpdlfh.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/jpdlfh.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/jpdlfh.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/jpdlfh.com\/en\/wp-json\/wp\/v2\/comments?post=1303"}],"version-history":[{"count":1,"href":"https:\/\/jpdlfh.com\/en\/wp-json\/wp\/v2\/posts\/1303\/revisions"}],"predecessor-version":[{"id":1305,"href":"https:\/\/jpdlfh.com\/en\/wp-json\/wp\/v2\/posts\/1303\/revisions\/1305"}],"wp:attachment":[{"href":"https:\/\/jpdlfh.com\/en\/wp-json\/wp\/v2\/media?parent=1303"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/jpdlfh.com\/en\/wp-json\/wp\/v2\/categories?post=1303"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/jpdlfh.com\/en\/wp-json\/wp\/v2\/tags?post=1303"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}