In this paper, we introduce the problems of large-scale steel construction projects (bridges, power stations, structures, high-rise buildings, etc.), the parts of Sunawachit, the complexity of the work, the operation in the field, and the criteria for the construction of large-scale steel structures.
Analysis of Specific Issues on Rebate Joining of Large Steel Structures:
Size and weight are difficult to hold and position.
Control of Deformation and Residual Stress in Thick Plate Welding.
The impact of the environment (wind, rain, and height) on the construction in the field.
Requirements for building industry standards (AWS D1.1, etc.).![图片[1]-大規模な構造鉄骨ワークのためのカスタマイズされたリベット打ちおよび溶接ソリューション。-大連富泓機械有限公司](https://jpdlfh.com/wp-content/uploads/2025/12/QQ20251002-201112.png)
A 4-part series of kastamazes and sorisons:
Stage 1: Joint Simulation of Design and Engineering: Finite Element Analysis (FEA) is used to simulate the distortion of the joints and to optimise the joint sequence and engineering.
Stage 2: Prehubisation and modularisation in the workplace: Precision welding of subunits is possible in a workplace environment that can be managed without restrictions, reducing the amount of work done in the field.
Stage 3: Hubbing of High Force Bolts and Soldering: The advantages of using solvent cementing and high force bolts together, and the advantages of combining the two.![图片[2]-大規模な構造鉄骨ワークのためのカスタマイズされたリベット打ちおよび溶接ソリューション。-大連富泓機械有限公司](https://jpdlfh.com/wp-content/uploads/2025/09/QQ20250829-200803-800x679.png)
Stage 4: Solventing management and quality control on site: A solventing worker's team is dispatched on mobile machines with no permits, and a QA/QC programme is implemented on site.
Success stories (illustrations): specific bridges are described in detail in the construction project, the problems encountered and their solutions.
Security and Projekt Management: The site's security and projekt/skeleton management system is a key focus.
Conclusion: The key to the success of the large-scale iron and steel construction project is the cooperation between the economically rich programme and the Patona.
Calls: The large-scale engineered container and the tower crane container are the first project plan and the view of the customer's project drawings, so please feel free to ask us about them.