The Whole Process of Integration of Older Structural Rehabilitation: A Practical Analysis of Technology Selection and Investment Return ("Analysis of Integration of Structural Rehabilitation Technologies and Investment Return")

The decision to replace the 12-base unit with a 15-year average life expectancy for the port in China was made on the following occasion.Static and Recreational MapsIntellectual property rights have been implemented, and there have been many debates within the community. The opponents have made some calculations. The total budget for the changeover is 28 million dolars, and the newly purchased equipment is 120 million dolars. The crop efficiency of the equipment is 23%, the consumption of energy is 18%, the number of workers has been reduced by 60%, and the investment recovery period is 2.8 years.

The core value of Intellectual Property Rights (IPR)isation of Stagecoach and Recreation Mills is clear in this case. In addition to the purely technological advancement, the potential of the equipment is being drawn out by the Intelligence Centre, which is fundamentally changing the operational paradigm.

I. Important diagnosis before the change: What machines are valued differently?
All of the ancient Starks and Recreation Mills are now being adapted to Intellectualisation. We are committed to the principle of "4 changes and 4 transformations":

The special features of the machine are proposed for modification:

Good mechanical structure: The main steel structure is not subject to cracking or deformation, and is the basis for repair.

The control system of Yuan is PLCアーキテクチャであっため、アップグレードは較easyであり、ある発電所の1998年製シーメンスS5システムはS7-1500へのアップグレードに成功した。

Stability of nuclear components: The residual life of large-sized components such as rotary beams and travelling mechanisms is more than 5 years.

Clear requirements for Intelligence: For example, the need for unmanned automatic drug delivery.图片[1]-老旧堆取料机智能化改造全流程:从技术选型到投资回收的实战解析(针对“智能化堆取料机改造技术方案与投资回报分析”)-大连富泓机械有限公司

We are recommending the remodelling of the school:

Deep fatigue in steel structures: disintegration of a steel plan equipment, and 17 m of cracks in the main beams.

The electrical system is aging. The Leroy system is not designed to be exchanged.

廃階廃する設備:残存耐用年數<3年

Excessive use environment: It is difficult to transform the rotting chemical substances or other substances to make it stable for turning.

You have to do all the work in front of the Reef, and you have to do all the work in 5 places:

Ultrasonic Testing of Steel Structures

Measurement of Track Straightness and Levelness

Electric insulation resistance test

Hydraulic System Consolidation and Leakage Tester

Gallery Measurement of Mechanical Driving System

II.3 Stages of Opinions on the Content of Change
The Intellectual Property Rights (IPR) and Truth in Matters (TIM) programmes are based on the need and expectation for practical implementation of the "Oral, OA, and Nascent" Opus:图片[2]-老旧堆取料机智能化改造全流程:从技术选型到投资回收的实战解析(针对“智能化堆取料机改造技术方案与投资回报分析”)-大连富泓机械有限公司

Basic level renovation (investment of 500,000-800,000 dlrs/unit):

Position Determination System: Encomada has added GNSS to achieve ±10cm position determination accuracy.

Video Surveillance System: High Resolution Camera and Remote Surveillance Addition

Data Acquisition Plattform: The machine's operating data is collected and monitored from a distance.
Payback period: Usually 1.5 to 2 years, mainly due to the reduction in the number of inspectors and the early identification of faults.

PROGRESS RETROFIT (1.2 to 2 million dlrs/unit of investment):
Vegetables are added:
4. Semi-automatic control: automatic piking of the workpiece and material.
5. Conflict Prevention System: Laser Skin Matta or Milipo Radar
6. Intelligent lubrication system: Automatic lubrication under operating conditions
Example of a power plant renovation: Investment amount 1.65 million RMB/base, Operating efficiency 15% up, Maintenance cost 25% down, Payback period 2.2 years.

Advanced / Fully Automated Retrofit (2.5 to 4 million DEL / UniT investment):
7. Fully Automatic: Accumulation of heavy weights and piking operations are completed automatically without human intervention.
8.3D Skinning System: Stoke Paill's Realtime 3D Modelling
9. Intelligent Systems: Production Systems, Connectivity, and Automated Optimisation of Utilisation Plans
Hong Kong: $3.2 million/centre, 24-hour unmanned turnaround, 70% manpower cost reduction, 2.5-3 years of investment return.

III.5 Ways to Realise Concrete Technology
経徑1:Measurement technology selection

Encore position determination: Low-cost (20,000 to 50,000 dal), high-precision (±2cm), and the need to maintain a traction base point.

GNSS measurement: The setup is simple (80,000 to 150,000 dal) and is subject to the effects of weather and sunlight.

UWB measurement: New technology (150,000-250,000 dal), accuracy of ±5cm max, suitable for indoor and overcast environments.
Practical Aplications: HOTONDO's users can choose the "Encoder + GNSS" dual redundancy software to ensure reliability.

Pas 2: Conflict avoidance system in practice
The following are some of the most popular models: Mechanical Remote Controls.
Height: Laser and Skin (50,000 to 80,000 dl for 1 unit). Protect the Elia and monitor the intruders with the Realtime.
Innovative Apropos of Harbours: RFID tags are installed in the walking paths of the Stagecoach and Recreation Mile, and the tags' positions are read, and the correct position and conflict avoidance are realised by combining the energy codes and the group.

経3:Automatic control layer
Reiya 1: Programme Concepts - Pristine Acoustic Concepts, Winchester Practices
Reiya 2: Modelling - Building a model for savings and automating business processes.
Raya 3: Intelligent Control - Mechanical Learning to Optimise Jabberwocky Parameters.
ティア1からスタートし、ステップアップしていくことをお勧めします。图片[3]-老旧堆取料机智能化改造全流程:从技术选型到投资回收的实战解析(针对“智能化堆取料机改造技术方案与投资回报分析”)-大连富泓机械有限公司

経route 4: Construction of Comic Networks and Networks
ワイヤライン・ソリューション:Light fibre-optic cables are laid along the lines.
ワイヤレス・ソリューション:5Gプライベート・ネットワークまたは産業用WiFi.
HIBRIDOSHIRON: Important control is online, video surveillance is wireless.

Road 5: Construction of the Monitar Centre
ROCAL MONITORING: Modelling and Structuring of the Royal Courtroom
Remote monitoring: We have set up a monitoring centre on our website.
クラウドプラットフォーム:データをクラウドにアップロードし、モバイル端末からのアクセスをサポート

IV. Calculation of the Investment Income Tax Rate
The SmartTransformer's Reiton is a complex number of files that can be calculated in detail:

Direct economic effects:

Savings in manpower cost: In the 3-sheet system with 2 persons per sheet, the annual manpower cost after de-personalisation will be reduced by approximately 360,000 to 480,000 RMB.

Reduction of Energy Consumption: To optimise the turnaround time, energy consumption will be reduced from 10 to 20%, resulting in an annual saving of 80,000 to 150,000 RMB in electrical materials.

Reduction of Montane Concepts: In terms of preservation of knowledge, the number of undefined domains has been reduced by 30 to 50%, and the number of annual Montane Concepts has been reduced by 60,000 to 120,000 dal per annum.

Increase in efficiency: Increase in production capacity due to improvement in business efficiency.

Indirect Economic Efficiency:

Upwards in safety: Reducing the risk of safety incidents by reducing manual work

Realtime data for making correct decisions on meaning

Extension of machine life: The life of the machine will be extended by 2 to 3 years by optimising the use of the machine.

The calculation of the investment recovery period:
Investment recovery period (years) = Total amount of investment in the revision ÷ Years including benefits

Causes calculations: 1.8 million dlrs invested in the renovation of Stagecoach and Recreation Mills

Reduction in the number of jobs per year: 420,000 dlrs

Annual net gallery savings: 110,000 dl.

Yearly savings on multinationals: 90,000 dl.

Annual efficiency upwards: 200,000 dl (presumed)
Year-on-year sales volume: 820,000dl
Investment recovery period: 180÷82≒2.2 years

V. Full Programmes Management of Trashfarm Introduction
Successful renovation project is necessary for strict management of the project, and we are recommending the 5 stages of the project to our clients:

FILMS I: PROGRAM DISCOVERY (between 4 and 8 weeks)
Main Menu: Analysis of the Revamping Technology Programme, Investment Estimates, and Expected Results
False idealisation of the actual site constraints by ignoring them.

Flex II: Machine Selection and Tuning (3-6 Weeks)
Basic Principle: Pursue the most advanced and the most appropriate measure.
A lesson learnt at the ironworks: If you choose a high-precision laser scanner, there will be a lot of misinformation at the site.

Size III: Setup and Test Drive (8-12 weeks)
BEST PRACTICES: Stage of practical, strained arrows, next to the system chatting
Time Allocation Proposal: Mechanical Equipment 30%, Electrical Equipment 40%, Softwares and Drives 30%

Focus IV: Trial Spinning and Optimisation (4-6 weeks)
Completion: Completion of Opletar, Treynin, Montanus, Protocole, and Emergency Time Plan
Trial Spinning Targets: System Occupancy Rate of 98% or more, Position Determination Accuracy of 98% or more, Automatic Spinning Success Rate of 95% or more.

Flexi V: Entry and Introduction (2 weeks)
The acceptance criteria include technical performance indicators, inspection of security features, and completeness of documentation.

VI.The Gaider of the "Rakutoshi Cave": Failure to Learn
Pitt 1: Excessive Automation
In Shanxi Province, the paraffinum liquidum has been fully automated in one go. As a result, the complexity of the system is high, failures are frequent, and the end of the process is that the functions of the machine are not used. Proposal:Semi-automaticから始めて、Matureしてからアップグレードする。

Pitt 2: Negligence in Human Resource Development
The Retrofit is completed, successful and thought out, and the OPRETARIER knows the way to make it work, and the MENTIONERS and STAFF know the way to make it work straight. Treynage is an important part of the programme.

Fudoshi Cave 3: Selection of the indirectly infringed surplice
The price of the products is based on the industry's experience and the non-experimental nature of the programmes. The selection of a service provider should be based on similar examples of projects.

PITT 4: Digital Intelligence Files are open for business
This system is closed to data, and other systems and systems are integrated. The Data-Interface Standard is expressly stated in the contract.

Loktoshi Cave 5: The Slowness of Pots and Montanans
It is necessary to ensure the annual maintenance budget of 3-5% for the investment in renovation in the Intelligent System.

Final Remarks: The Smart Renovation is an investment that will provide long-term benefits. In the meantime, we will calculate the total cost of ownership over a period of 5 or 10 years, depending on the cost of purchase. We are working on a pilot plant to help promote its popularity. The value of this programme of change and the strengthening of the capacity of the system is very important, as well as the importance of the machine and its integrated design.

© copyright statement
THE END
If you like it, support it.
kudos12 share (joys, benefits, privileges etc) with others
commentaries sofa-buying

Please log in to post a comment

    No comments